Monday, 7 September 2015
Pre-Production: Shooting Schedule
Our chosen date
The only date which our whole group would be able to do is Sunday 13th September at 12pm. However, due to another event being held at 1:30pm on our stage we would only be available to us for an hour and a half, meaning that we would be really pressed for time. We will be taking two cameras to the shoot so that for each run through of the song, we could film the children from two different set ups, in the hope that we may be able to get through all of the shots which we had planned in the shot amount of time.